
Raschka Engineering Ltd
Address: Panoramastrasse 40
CH-6373 Ennetbürgen, Switzerland
Tel: +41 79 750 9845
E-mail: info@raschka-eng.com
Raschka Engineering Ltd – Winterthur Office
Address: Neustadtgasse 1A
CH-8400 Winterthur, Switzerland
Tel: +41 76 830 1995
E-mail: info@raschka-eng.com
Raschka Guangzhou Engineering & Technology Co., Ltd.
Address: Room 40101, 3th Building, No. 1 Qinghui Middle Road, Nansha District, Guangzhou, China
15 Floor, North Tower, Peace Business Centre, No. 880 of Guangzhou Avenue South, 510305, Guangzhou, China
Tel: +86 (0) 20 8966 4189
Fax: +86 (0) 20 8966 4278
E-mail: info@raschka-eng.com
Website: www.raschka-engineering.com
Raschka Representative Tianjin, China
Add: 809, Jinxing Plaza, No. 65 of Xiqing Road, Tianjin, China
Tel: +86 (0) 22 2292 7887
Raschka Representative Wuxi, China
Add: 18-1, Fengyang Road, Huishan Economic Development District, Wuxi, China
Tel: +86 (0) 510-8331 2868
Raschka Representative Beijing, China
Add: Room 7, No.9 Building, Tongtian Yuan, Changping District, Beijing, China
Tel: +86 (0) 10-8482 0795
Raschka Representative Singapore / S.E.A
Novexx Engineering Pte Ltd
Add: 8 Tuas View Loop, Singapore 637674
Tel: +65 6896 6620
Website: www.novexx.com.sg
Raschka Representative Brazil
BIOCAL Burntech
Add: Rua Pitangueira, 865, Bairro Siegel, Agrolândia,Santa Catarina – CEP: 88.420-000
Tel:+55 47 3534 5400
E-mail: contato@biocal.ind.br
Website: www.biocal.ind.br
Guangzhou/Liestal, June 2019, Raschka Engineering has been awarded with an EPC contract by Nantong Acetic Acid Chemical Co., Ltd for a new hazardous waste incineration plant.
This new plant is located at Nantong Economic and Technological Development district, with a hazardous waste treatment capacity of 35,000 ton per year.
Technical data:
Plant | Hazardous Wastes Incineration Plant |
Customer | Nantong Acetic Acid Chemical Co., Ltd. |
Start Up | 2021 |
Fuel | Solid waste (Active Carbon, Sludge, etc.) and liquid waste |
Fuel Capacity | 35’000 ton/year |
Incineration Type | FBI and second combustion chamber |
Incineration Conditions | Acc. to European Regulations/ Chinese Regulation GB18484-2001/ Regional and Integrated Emission standard of Air Pollution-DB 372376 |
Steam Parameter | 2.5 Mpa(g), 226℃ |
Steam Generation | 15 t/h |
Flue Gas Cleaning | SNCR+Quench+BHF+Scrubber+Absorber+WESP+GGH |
Flue Gas Volume | 57´000 Nm3/h |
